Office fit-outs
Office walls and ceilings jointed ready for decoration, like the Aspire and Platinum offices in Bournemouth.
Plasterboard finishing by CC Drylining
Plasterboard walls and ceilings taped, filled and sanded flat for offices, colleges, new builds and homes. Our own team boards and joints, so every room is handed over ready to decorate.
Leave your number and we will call you back
Smooth walls, quicker handovers
Plasterboard arrives as separate sheets with visible seams, screw heads and raw edges. Tape and jointing is the finishing trade that hides all of it, so a new partition, a boarded ceiling or a whole floor of offices ends up as one continuous surface that takes paint evenly.
CC Drylining is a Dorset drylining contractor based in Ferndown. Jointing is daily work for us on commercial fit-outs, college buildings and new developments, and we bring the same care to a single room or a house that has just been reboarded.
AECC, Bournemouth The process
Every job follows the same four stages. Skip one and it shows as soon as the first coat of paint goes on.
Fixings, gaps and damaged edges are checked and put right first. A joint can only be as flat as the boards either side of it.
Tape is pressed into a bedding coat over every joint, and metal beads go on the external corners so they stay straight and hard-wearing.
Wider coats follow once each one has dried, feathering the compound out so the joint fades into the board instead of standing proud.
Joints are sanded smooth and checked with a light across the surface, then touched up until nothing shows. The room is ready for the decorator.
Choosing a finish
Both give a smooth wall. Which one suits your job depends on the surface and the programme.
| Tape and jointing | Skim plaster | |
|---|---|---|
| How it works | Joints, screw heads and corners are filled and sanded; the board face itself stays as the finish. | A thin coat of wet plaster is trowelled over the whole surface. |
| Best suited to | New partitions, ceilings and boarded rooms in offices, schools, new builds and extensions. | Older walls, patched or uneven surfaces, and clients who want a plastered finish. |
| On site | Dry trade. Other trades can usually work nearby while joints are filled and sanded. | Wet trade. Needs space to work and longer before the room is dry. |
| Before painting | Sand, dust off and prime with a plasterboard primer or mist coat. | Leave to dry fully, then a mist coat before the finish coats. |
Who we work for
Main contractors, developers, businesses and homeowners across Dorset bring us in at the boarding and finishing stage.
Office walls and ceilings jointed ready for decoration, like the Aspire and Platinum offices in Bournemouth.
Large areas of board finished to programme, including AECC in Bournemouth and Ferndown school.
Boarded ceilings and tall spaces jointed from towers, as at Cobham Road in Ferndown.
Whole houses after a refurbishment, such as a fully boarded and jointed home in Christchurch.
New homes and developments finished room by room, with the joints left ready for the decorating trade.
Metal stud walls framed, boarded and jointed by one team, so the finish is only as good as our own work.
Recent work
All photos are CC Drylining jobs; each caption says what we did there.
Pricing
Every price comes from a visit or a set of drawings, never a fixed rate. The figure moves with the following.
How many square metres need finishing, and whether any of it is high enough to need a tower.
Overhead jointing is slower work than walls of the same area.
Windows, door openings and external corners all add bead and detail work.
Walls lit from the side or taking a dark paint need a more exacting finish than a store room.
Boards fixed by others may need screws reset or edges repaired before we start.
Occupied buildings and phased handovers change how the work is scheduled.
Coverage
Our office in Ferndown sits close to the middle of the Poole, Bournemouth and Christchurch conurbation, and travel across the county for larger contracts.
Building a new partition as well? See our stud wall pages for Poole, Christchurch and Bournemouth.
FAQs
It is the way plasterboard is finished without a full skim of plaster. Paper or mesh tape is bedded over every joint between boards, then the joints, screw heads and corner beads are filled with jointing compound in thin coats, feathered out and sanded until the whole wall or ceiling looks like a single flat sheet.
Neither is better everywhere. Taped joints suit new partitions and ceilings in offices, schools and new builds, where the boards are flat and the room has to be ready for decorators quickly. A skim coat suits old walls, patched surfaces and rooms where the client wants a traditional plaster finish. We will tell you which one your job needs when we see it.
Yes, once it is sanded and dust-free. The board face and the filled joints absorb paint differently, so a diluted mist coat or plasterboard primer goes on first, then the finish coats. CC Drylining can do the decorating as well if you want one firm for the whole job.
Yes. We look at the boarding first: screws set too deep or too proud, wide gaps and damaged edges show through the finish, so we point out anything that needs putting right before the jointing starts.
Both. Most of our tape and jointing is in offices, colleges and new developments, but we also work in private homes, such as a house in Christchurch that we boarded and jointed throughout.
Yes. Call 01202 402 184 or use the form; we visit, measure up and send a quote you are free to turn down.
Tape and jointing and stud walls across Dorset
Free quotes
Tell us the size of the job, whether the boards are already up, and when you need the walls ready. We will visit, then send a free quote.